
Hoody got here at 7AM (suppose to have been 6:30, heheh, but he was up until midnight finishing off his frame). The plan was to pop the cherry on both our virgin HERMS brew frames with two 10 gallon AG brews. He was doing a Squatters Full Suspension and me a Fat Tire American Amber clone. We planned to split the 10 gallons so we would each have 5 gallons to keg rack in two weeks.
Heheh, it could have been worse, that is for certain. We fumbled through it, and actually ended up with no major emergencies (though Hoody brought a small hardware store in supplies with him and was making up hoses and fittings right up until the end).
The biggest problem we had was priming our counter flow chillers. The aeration stone worked well once we got the beer out of the inline air filter that backflowed before we got it turned on.
One thing that happened, is I missed my OG on the boil by quite a bit (needed 1.051, and only hit 1.033, and even supplementing 1.25 lbs of DME only brought it up to 1.038). Anyway, we'll see what happens.
When I finished with my batch, it was almost 100'F out and the sun was really hot. The wort only cooled down to about 80'F, and we were so busy, that I just pitched the yeast without checking it first. What happens if you pitch yeast into that hot of wort? It is in the house coming down to 72'F, but I'm a bit worried.
More later (need to decompile all the notes I took and everything else). I suspect our efficiencies are pretty low, considering I started with 18 lbs of grain and hit 14 gallons preboil with low SG.


































